Remote control system for a locomotive |
| RE39210 |
Remote control system for a locomotive
|
|
| Patent Drawings: | |
| Inventor: |
Horst, et al. |
| Date Issued: |
August 1, 2006 |
| Application: |
10/374,589 |
| Filed: |
February 26, 2003 |
| Inventors: |
Bousquet; Jean L. (Montreal, CA) Cass; George R. (Montreal, CA) Doig; Kelly (Ottawa, CA) Horst; Folkert (Pierrefonds, CA) Szklar; Oleh (St-Hubert, CA)
|
| Assignee: |
Cattron Intellectual Property Corporation (Sharpsville, PA) |
| Primary Examiner: |
Le; Mark T. |
| Assistant Examiner: |
|
| Attorney Or Agent: |
Zagorin O'Brien Graham LLP |
| U.S. Class: |
246/187A; 340/825.69 |
| Field Of Search: |
246/167R; 246/182R; 246/182B; 246/182C; 246/187R; 246/183; 246/186; 246/187A; 246/187B; 104/295; 104/296; 340/825.69; 340/825.62; 340/825.72; 701/19; 701/20 |
| International Class: |
B61L 3/00 |
| U.S Patent Documents: |
733035; 1360150; 1437637; 1515948; 1653172; 1765173; 1788815; 1816628; 1923499; 1929297; 2235112; 2257473; 2278358; 2331003; 2447669; 2513342; 2523662; 2576424; 2643369; 2649835; 2708885; 2709773; 2743678; 2768331; 2769601; 2780300; 2832426; 2948234; 2951452; 2961640; 2993299; 2998513; 3029893; 3072785; 3086319; 3096056; 3201899; 3205618; 3218454; 3227870; 3229086; 3239962; 3253143; 3263625; 3268727; 3293549; 3304501; 3312818; 3315613; 3328580; 3355584; 3355643; 3361082; 3368073; 3374035; 3378817; 3380399; 3384033; 3402972; 3530434; 3539226; 3553449; 3583771; 3593293; 3601605; 3610363; 3628463; 3639755; 3646613; 3650216; 3652937; 3655962; 3660653; 3686447; 3687082; 3694650; 3696758; 3728565; 3811112; 3840736; RE28306; 3870939; 3880088; 3885137; 3904249; 3906348; 3937431; 3941202; 3964701; 3980261; 3994237; 4002314; 4005837; 4005838; 4013323; 4015082; 4041470; 4056286; 4063784; 4066299; 4067264; 4087066; 4093161; 4095764; 4108501; 4118774; 4133504; 4138723; 4139239; 4156864; 4162486; 4164872; 4179624; 4179739; 4189713; 4190220; 4235402; 4241331; 4266273; 4303215; 4331917; 4335381; 4344138; 4347563; 4347569; 4349196; 4352103; 4370614; 4402082; 4410983; 4445175; 4450403; 4456997; 4459668; 4463289; 4464659; 4475159; 4486839; 4487060; 4495578; 4498016; 4513604; 4519002; 4525011; 4553723; 4572996; 4588932; 4614274; 4620280; 4621833; 4641243; 4654881; 4665833; 4687258; 4710880; 4723213; 4726299; 4733616; 4733740; 4768740; 4775116; 4791254; 4793088; 4854529; 4870419; 4872195; 4893240; 4896090; 4901953; 4950964; 4955304; 5005014; 5012749; 5018009; 5029532; 5039038; 5050505; 5065963; 5085148; 5109543; 5172316; 5172960; 5188038; 5222024; 5244055; 5249125; 5251856; 5264789; 5284097; 5369587; 5376869; 5408411; 5412572; 5474267; 5479156; 5590042 |
| Foreign Patent Documents: |
670272; 1245744; 1 580 940; 2 052 009; 2 160 494; 25 28 463; 26 28 905; 26 33 089; 26 35 751; 26 40 756; 27 41 584; 28 48 984; 29 25 196; 29 21 860; 29 43 385; 30 26 652; 31 12 793; 30 40 080; 30 47 637; 31 26 383; 32 08 819; 35 40 563; 35 40 563; 37 02 527; 0 030 121; 0 102 017; 0 102 017; 0 132 467; 0 326 630; 0 326 630; 0 499 515; 0 499 515; 2 542 951; 1179751; 1 353 438; 1 406 711; 1430642; 1430644; 1430645; 1485420; 1 501 234; 1 501 372; 1 526 033; 1543917; 1543918; 2 024 484; 2 035 487; 2 054 229; 2 107 910; 2 159 995; 2 167 886; 2 186725; 2 188 464; 52-105406; 53-064308; 3-104769; 04-266538; 04-364307; 669375; WO 84/03672; WO 85/01258 |
| Other References: |
LCS BP Presentation, "Locomotive Control System Symington Yard," Sep., 1991 (pp. 1-15). cited by examiner. Letter (in German) dated Aug. 14, 1991, to Theimeg USA from Ingrid Lange regarding travel plan and tickets for CN personnel (translation included)(7 pages). cited by other. Program (in German) dated Oct. 5, 1989, for visit of Cliff Johnstone (translation included)(6 pages). cited by other. CN Technoligical Development (LCS BP Presentation) "Locomotive Control System LCS-Beltpack", (fax dated Oct. 11, 1994) pp. 1-13. cited by other. Letter dated Apr. 21, 1992, to J.W. Armstrong from D.H. Grant regarding flat yard testing (2 pages). cited by other. Schematic Wiring Diagram, Mar. 7, 1990 (30 pages). cited by other. Letter dated Jul. 7, 1989, to Cliff Johnstone from Fredrick Goy regarding THEIMEG Remote Control and Data Transmission systems for railroads (2 pages). cited by other. Memo dated Aug. 13, 1991, to H. Plum from H. Rische regarding CN topics of discussion (1 page). cited by other. Memo dated Sep. 2, 1991, to GF from T (signed by Hans-Jurgen Wunderer) regarding description of the actual Vectran-CN-System for meeting on Aug. 30, 1991 with Mr. Horst (4 pages). cited by other. Letter dated Sep. 9, 1991, to Theimeg Electronikgerate from John Risch regarding Canadian National--Feedback from Cliff Johnstone (1 page). cite- d by other. Letter dated Sep. 18, 1991, to Mr. G.C. Hutt from John G. Risch regarding translation from Deutsche Bundesbahn (2 pages). cited by other. Summary of information to gather during visit to Theimeg (2 pages), (no date). cited by other. Radio Controlled Mine Locomotive, Measurement and Control, vol. 9, Jul. 1975, p. 256. cited by other. S.D. Zaets & A.M. Shul'Ga, Braking System for Remotely and Automatically Controlled Electric Locomotives, Koksi Khimiya, No. 3, pp. 43-44, (no date). cited by other. Massie, Herbert L., Channel Utilization by Remote Locomotive Control Systems Using Digital Transmission, Atchison, Topeka & Sante Fe Railway Company, pp. 134-137, (no date). cited by other. Remote Control of Slave Locomotives, The Railway Gazette, Sep. 6, 1968, pp. 672-673. cited by other. Parker, C.W., Design and Operation of Remote-Controlled Locomotives in Freight Trains, Jan. 1974, pp. 29-38. cited by other. KCS Extends Remote Controlled Locomotive Operation and CTC, Railway System Controls, Dec. 1972, pp. 28-29. cited by other. Republic of South Africa Application for a Patent Acknowledgement of Receipt entitled "Data Transmission Systems," dated Jul. 2, 1982, Hans-Arnim Lange; Patent Application No. 824733, pp. -14. cited by other. Radio-Controlled Locomotives, BBC Summary of World Broadcasts, Copyright 1986 The British Broadcasting Corporation, Jul. 12, 1986, p. -1. cited by other. SMET Automatic Control System for Multiple Trains, BBC Summary of World Broadcasts, Copyright 1986 The British Broadcasting Corporation, Sep. 12, 1986, pp. -3. cited by other. Mcqueen, W.M. & Co. Pty Ltd., Deep Seam-Face Automation Stage 3--Continuous Haulage and Miner Remote Control, Commonwealth of Australia, National Energy Research, Development & Demonstration Program, End of Grant Report No. 752, May 1988, pp. -284.cited by other. Welty, Gus, ATCS: More Than "Train Control," Railway Age, Aug. 1988, pp. 45-49. cited by other. Macro Benefits From Microprocessors, Railway Age, Mar. 1989, pp. 38-40. cited by other. Miller, Luther S., ATCS Advances in Canada, Railway Age, Mar. 1989, pp. 41-43. cited by other. Products Report, Railway Age, Aug. 1989, pp. 73-74. cited by other. What's Holding up ATCS?, Railway Age, Apr. 1990, pp. 39-41. cited by other. Implementation Officers Play Key Role (Association of American Railroads Vehicle Track Systems Newsletter), Railway Age, Copyright Simmons-Boardman Publishing Corp. 1990, Jun. 1, 1990, pp. 1-4. cited by other. Update, Woodward's Complete Locomotive Control, Railway Age, Jul. 1990, pp. 3. cited by other. Welty, Gus, Putting The Pieces Together. (High-Tech Railroading), Railway Age, Copyright Simmons-Boardman Publishing Corp. 1990, Sep. 1, 1990, pp. 2-6. cited by other. ATCS Advances--Slowly, Railway Age, Feb. 1991, pp. -3. cited by other. Canada's Troubled Railroads, Railway Age, Feb. 1991, pp. -3. cited by othe- r. LITERATURE, Railway Age, Mar. 1991, pp. -3. cited by other. Carlson, Frederick G., & Hawthorne, Keith L., Train Braking Systems, Now and Into the Future, Railway Age, Copyright Simmons-Boardman Publishing Corp. 1992, Jan. 1, 1992, pp. 1-8. cited by other. Rail Update, Railway Age, Sep. 1992, pp. -2. cited by other. Vantuono, William C., Lirr: Customer-Focused. (Long Island Railroad; Includes A Related Article on The Railroad's Freight Business), Railway Age, Copyright Simmons-Boardman Publishing Company 1992, Oct. 1, 1992, pp. 1-7. cited by other. Wilson, Mark, CN to Axe 10,000 Workers Over 3 Years, 2002 Southam Inc., Vancouver Province, Dec. 11, 1992, pp. -2. cited by other. Tougyuam, Lia, et al., Application of Locomotive Radio Remote Control Technique to Heavy Haul Combined Train in Mountainous Region, pp. 102-109. cited by other. Stephens, Bill, Running Trains by Remote Control, Trains, Mar. 1994, pp. 45-49. cited by other. Vectran Corp. (Relocates), Railway Age; Copyright Simmons-Boardman Publishing Company 1994, Mar. 1, 1994, p. -1. cited by other. Quantum-VMV Trainmaster.TM. Locomotive Control System, Paducahbilt, http://www.paducahbilt.com/Pages/trainmaster_new.htm, Feb. 27, 2002, pp. 1-4. cited by other. Cut Your Fuel Costs Without Throttling Performance, Transportation Technology Worldwide, p. -1, (no date). cited by other. Armstrong, John H., Industrial Car Movers: New Power in an Old Package, Railway Age, Mar. 10, 1980, pp. 25-26. cited by other. Angold, J. A., Experience with a Long Distance Unit Coal Train, Contributed by the Intersociety Committee on Transportation for presentation at the Intersociety Conference on Transportation, Atlanta, Georgia, Jul. 14-18, 1975, pp. 1-7. cited byother. Davis, Harold, Thin Seam Yields High Output, Coal Age, Jul. 1979, pp. 104-107. cited by other. Azouaoui, Youssef, Tough Environment Dictates Standards of Electrification, Railway Gazette International, Jun. 1980, pp. 501-505. cited by other. FCC Grants Petition on Tone Modulation, Railway System Controls, Jul. 1972, pp. 11-12. cited by other. New Concepts in Today's Track Mines, E/MJ Mining Guidebook, Jun. 1970, pp. 164-167. cited by other. Huybrechts, J.C.R., Telecommunications and Remote Control in Underground Workings (German/French document), Annales des Mines de Belgique, Jun. 1980, pp. 637-651. cited by other. Zolle, Gunther, Heutiger Stand der Funkfernsteuerung von Industerielokomotiven in einem Huttenwerk, Stahl u. Eisen 102 (1982) Nr. 24, pp. 1237-1238. cited by other. Schiefar, Werner and Stubler, Heinz, Use of remote-controlled locomotives in an iron and steel works, Stahl u. Eisen 95 (1975) Nr. 20, pp. 931-936. cited by other. Verlagsbuchhandlung, Georg Siemens, Present state of development of radio-controlled locomotive operation, ZEV-Glas. Ann. 107 (1983) Nr. 11, pp. 380-385. cited by other. Schmidt, Manfred, Funkferngesteuerte Abdruklokmotiven, Eisenbahningenieur 1981, pp. 527-535. cited by other. Meier, Felix and Kraahenbuhl, Von Peter, Rationalisierung durch Lok-Fernsteuerung, Funkanlagen, Apr. 1981, pp. 360-364. cited by other. Sapahob, et al., Chctema Teaeynpabaehhr Aokomothbom "TA-76", Astomstinka, pp. 14-17, (no date). cited by other. Tukaoka, Tudush, et al., Automatic Train Operation Equipment Remote Control Type for the Shunting Locomotive in Ironworks, 1974, pp. 49-54. cited by other. Tatematau, Osamu et al., Radio Control System of Diesel Hydraulic Locomotive, UDC 625 282-519, 1970, pp. 671-675. cited by other. Biesenbaen, Von Wolfgang and Backer, Kurt, Funkfernsteuerung von Rangierlokomotiven mit tragbarem Sendegerat, pp. 295-302, (no date). cite- d by other. Ullrich, Gerhard, Fernsteuerung von Industrielokomotiven am Entladebunker des Kraftwerkes Scholven der Hibernia AG, Techn. Mitt AEG-Telefunken 60 (1970) 4, pp. 246-250. cited by other. Linde, Helmut et al., Ferngesteuerte Thyristor-Grubenlokomotiven fur den Erzbergbau, Techn. Mitt AEG-Telefunken 60 (1970) 4, pp. 239-246. cited by other. Streit, Von Manfred, Funk-Fernsteuerung von Rangierlokomotiven, 1977, pp. -3. cited by other. Frank, W., Automatic Radio Control for Train Running, Signal und Draht, vol. 69, No. 4, Apr. 1977, pp. 69-76. cited by other. Richter, R., Radio-Remote Control of Locomotives on Factory Sites, Journal Berg-Huettenmaenn. Monatsh, Jan. 1980, 125 (1), pp. 29-36. cited by other. Gabriel, Jiri, Vyu{hacek over (z)}iti bezdratoveho p{hacek over (r)}enosu k dalkovemu {hacek over (r)}izeni posunovacich lokomotiv, Elektrotechn. obzor 69, (1980), pp. 452-454. cited by other. Gunther, J., et al., Fu BR 80 Type-a novel radio-remote control facility for brake test plants, Signal und Draht, vol. 75, No. 11, pp. 202-209, (no date). cited by other. Rieger, Franz, Operation with Diesel Locomotives on the German Federal Railways, Eisennahningenieur, vol. 36, No. 12, Dec. 1985, pp. 561-566. cited by other. Schmidt, M. and Schurmans, P., Radio Remote-Controlled Humping Locos-Signalling Elements, Signal und Draht, vol. 80, No. 9, Sep. 1988, pp. 205-207. cited by other. Rockwell International, If You Knew What Rockwell ATCS Could Do For Your Bottom Line, We'd Already Be Talking, Railway Age, Jun. 1989, pp. -4. cit- ed by other. Grolms, R. And Schmidt, M., Radio Remote Control of the Hump Locomotives at the Munich (North) Marshalling Yard, Signal und Draht, vol. 82, No. 12, 1990, pp. 231-235. cited by other. Yukatsu Sijustso (Hydraulic & Pneumatics), Special Issue: Radio Control of Industrial Equipment. Radio Control of Equipment at Steel Works, 1993, vol. 32, No. 12, pp. 43-47. cited by other. Zirouhov, EI And Levin, IG, Remote Control of Locomotives Hauling Heavy Trains, Zheleznodorozhnyi Transport, No. 6, 1977, pp. 49-53. cited by oth- er. Streit, Von Manfred, Funk-Fernsteuerung von Rangierlokomotiven, Apr. 1977, pp. -3. cited by other. Escher, Roland, Remote Control and Transmission of Data by Radio, Technische Mitteilungen AEG-Telefunken, vol. 64, No. 4, 1974, pp. 129-131. cited by other. Grolms, Reinhard and Mickler, Gunther, Humping Control System Using 32-bit Technology for the Munich-North Marshalling Yard, Signal und Draht, 1989, pp. 206-214. cited by other. Thomas, Karl, Funkfernsteuerung von Dieselrangierlokomotiven bei der Deutschen Bundesbahn, ISSN 0342-8753, 1981-82, pp. 26-34. cited by other. Go, G.B., A Modular-Built Warning System to Warn Track Maintenance Gangs of Approaching Trains, Signal und Draht, vol. 69, Nr. 1/2, 1977, pp. 29-31. cited by other. Wolf, K.H., Efficient Shunting With Consideration of the Physical Stress on the Crew, Shahl und Eisen, vol. 97, Nr. 17, 1977, pp. 810-814. cited by other. Linker, W., and Schliebus, K., Locally-Operated Electric Switch. Mode of Operation and Possible Uses, Signal und Draht, vol. 72, No. 1-2, Jan.-Feb. 1980, pp. 35-38. cited by other. Koerbs, Thorald, Radio Remote Control for VPS Shunting Operations, Zeitschrift fuer Eisenbahnwesen und Verkehrstechnik--Glasara Annalen, vol. 109, Nr. 2-3, Feb.-Mar. 1985, pp. 142-148. cited by other. Zolle, Von Gunther, Funkfernsteuerung von Industsrielokomotiven in der Bundesrepublik Deutschland, Zeitschrift fuer Eisenbahnwesen und Verkahrstechnik, 109 (2-3), 1985, pp. 122-130. cited by other. Japanese Document, Maruzen IEEE, ISBN4-621-03400-6 C3554, 1989, p. 596. cited by other. Fischer, K., Radio-Telephone for Railroads and Local Traffic, Glasers Ann, vol. 94, Nr. 12, Dec. 1970, pp. 387-393. cited by other. CN Technical Research Centre, "Flat Yard Switching Project, Minutes of Status Meeting #1 with Transportion--Technological Development," dated Apr. 10, 1989, pp. 1-2. cited by other. "CN Technical Research, Flat Yard Beltpack System (FYBS) Presentation," dated Jan. 15, 1992, pp. 1-2, context diagram, and Figure 4.2. cited by other. "Flat Yard Beltpack System--External Design Report," CANAC International Inc., dated Jan. 22, 1993, pp. 1-4 (errata sheets); pp. 1-4; 1-1-1-2; 2-1; 3-1-3-4; 4-1-4-30; 5-1-5-2; 6-1-6-12; 7-1-7-4; 8-1-8-3; A1-1-A1-10; A2-1-A2-2. cited by other. Fax cover sheet from F. Horst to G. C. Hutt dated Jul. 6, 1990 with attachments: (1) letter from F. Horst to G. C. Hutt dated Jul. 5, 1990 regarding Flat Yard Beltpack Demonstration Unit Loco #7530--1 page; (2) letter from R. Schreyer to W. N.Caldwell dated Jul. 5, 1990, including Vectran Specification #900235 Modifications to CNR Equipments--4 pages. cited by other. Letter from N. Caldwell to G. C. Hutt dated Oct. 10, 1990 with attached "External Design Report for CN7530 Demonstration Upgrade," CN Techincal Research Center, dated Oct. 1990 (Title page, contents page, pp. 1-10). cited by other. Fax Cover (1 page) to ATSE from CN North America dated Oct. 22, 1992, with Locomotive Control System LCS--Beltpack Flat Yard Application CN Rail (11 pages). cited by other. Letter to H.C. Henry from G. Patterson dated Dec. 18, 1992 (1 page), letter to R.M. Schmidt from G. Patterson dated Apr. 1, 1993 (2 pages), with a copy of the enclosures (Proposal to ATSF Railway Co. for Application of a Beltpack Locomotive ControlSystem at Argentine Yard--Mar. 1993 proposed 904A)(16 pages), Canac International Inc. Railroad Technologies Division Humping Procedures (2 pages)and LCS ATSF Argentine Yard Mar. 1993 (1 page) and System Price (1 page). cited by oth- er. Copy of business card of John T. Bruere (1 page); letter to Canadian National Railway Company from John T. Bruere dated Jan. 25, 1991 (1 page), with a copy of the enclosures (Proposal Flat Yard Beltpack System Canadian National Railways)(44 pages).cited by other. Canadian National Contract Proposal by Theimeg USA, Inc., dated Feb. 15, 1991 (87 pages). cited by other. Fax Cover to Glen W. Masleck from John G. Risch dated Nov. 23, 1992 (1 page) with letter to Doug Arsineau from John G. Risch dated Nov. 23, 1992 (1 page), and letter to Glenn W. Masleck from John Risch dated Nov. 23, 1992 (9 pages). cited by other. Fax Cover to Canadian National Railways from Richard C. Seeman dated Dec. 18, 1991, with invoice No. 12320 and requisition item (3 pages). cited by other. Purchase Order No. 00-6677 dated Dec. 22, 1992, with letter to Jeffrey A. McCann dated Dec. 21, 1992, with Command Confirmation Report (3 pages). cited by other. Letter to Glenn Masleck from Robert R. O'Farrell dated Feb. 13, 1991 (1 page), with Vectran Proposal 910140 (32 pages). cited by other. Fax cover to Glenn W. Masleck from Jeffrey A. McCann dated Dec. 7, 1992, with quotation No. 920384-4, and fax to G. Patterson from Doug Arsineau dated Dec. 8, 1992 (5 pages). cited by other. Fax Cover to Glen. W. Masleck from Jeffrey A. McCann dated Dec. 7, 1992, with revised quoation No. 920384-3 (4 pages). cited by other. Letter to Glen W. Masleck and Doug Arsineau from Jeffrey A. McCann dated Dec. 4, 1992 (1 page), with Vectran quotation No. 920384-2 (3 pages). cit- ed by other. Quotation No. 920384-1 dated Nov. 4, 1992, to Glenn W. Masleck (5 pages). cited by other. Letter to Glenn W. Masleck from Jeffrey A. McCann dated Nov. 4, 1992 (1 page), with quotation No. 920384 (5 pages). cited by other. Capital Appropriation No. 702-2150 for 1992-93 regarding Locomotive Control System--provide equipment for Beltpack Operation of 4 prototype locomotives (5 pages). cited by other. Hand-written note (1 page), order recommendation to R.G. Butler, dated Dec. 10, 1992, file/bid No. 26 controls loco remote 90-1 (2 pages), and quoation No. 920384-4 (3 pages). cited by other. Order recommendation to R.G. Butler dated Dec. 16, 1992, filed/bid No. 26 controls loco remote 90-1 (2 pages). cited by other. Letter to Dr. Nelson Caldwell from Robert R. O'Farrell dated Dec. 10, 1992, regarding recieved/decoder configuration and operation, with Proposed Configuration of Vectran Reciever/Decoder for CN Flayard Applications and current Vectran receiverdecoder scheme (3 pages). cited by other. Fax cover and letter to Glenn L. Masleck from Robert R. O'Farrell dated Dec. 11, 1992, with locomotive control system for flatyard applications pilot production program 1993 spreadsheet (3 pages). cited by other. Fax cover to Glenn W. Masleck from Jeffrey A. McCann dated Nov. 19, 1992, and Confidentiality Undertaking (2 pages). cited by other. Command Confirmation Report dated Oct. 30, 1992, with fax cover to J.A. McCann from G. W. Masleck dated Oct. 30, 1992, and with Locomotive Control System for Flat Yard Application LCS-FYBS Radio Subsystem Specification Highlights (3 pages). cited byother. Fax cover to J.A. McCann from D. A. Arsineau dated Nov. 19, 1992 (1 page), with Locomotive Control System for Flat Yard Applications LCS-FYBS Radio Subsystem Specification Highlights and Confidentiality Undertaking forms (4 pages). cited by other. Fax cover and letter to Cliff Johnstone from Neal MacNeal dated Oct. 9, 1992 (5 pages), with Technical Description for Offer OL 82 160 738-2, and drawing (7 pages). cited by other. Fax cover to H. Plum from N. MacNeal dated May 31, 1991, and letter to G.C. Hutt from John Risch dated Jun. 4, 1991 (2 pages). cited by other. Request for Proposal (3 pages), (no date). cited by other. Telefax to Cliff Johnstone from John G. Risch dated Apr. 26, 1991, and memo to Cliff Johnstone from John Risch dated May 30, 1991 (2 pages). cit- ed by other. Letter to D.G. Parsons from Hans-Georg Reiss dated Nov. 5, 1987 (2 pages) with quotation No. 60.202/01.87 dated Nov. 5, 1987 (4 pages), Request for Quotation dated Oct. 13, 1987 (1 page), and letter to Fredrich Goy from D.H. Grant dated Sep. 16,1987 (1 page). cited by other. Quotation No. 60.303/07.89 (2 pages), Jul. 1989. cited by other. Canadian National Contract Proposal dated Feb. 15, 1991, by Theimeg USA, Inc. (3 pages). cited by other. Request for Proposal (1 page), (no date). cited by other. Letter to J.C. Johnstone from John G. Risch dated Sep. 19, 1991 (2 pages). cited by other. Memorandum to H. Plum from H. Risch dated Feb. 10, 1992, Cliff Johnstone (1 page). cited by other. Fax cover to J. Risch from D.A. Arsineau dated Nov. 19, 1992, with copy of Locomotive Control System for Flat Yard Applications LCS-FYBS Radio Subsystem Specification Highlights (4 pages). cited by other. Fax cover and letter to Glen W. Masleck from John G. Risch dated Nov. 23, 1992 (9 pages), additional letter to Glenn Masleck from John Risch dated Nov. 23, 1992 (11 pages). cited by other. Letter to G.C. Hutt from John Risch dated Jul. 2, 1991, regarding reduction to price of prototype systems (2 pages). cited by other. Fax cover to G.C. Hutt from John Risch dated Jun. 3, 1991, regarding proposed modification of quotation L-0012-02.14 (1 page). cited by other. Locomotive Control System Flat Yard Beltpack Systems CN FYBS Project Status Meeting No. 2 (10 pages), (no date). cited by other. Memo from Fred Horst dated Mar. 30, 1992 (1 page) with Project: Flatyard Beltpack System (FYBS) Project #6905 File: EM-6085-2-905--Draft Radio Subsystem Specification dated Mar. 30, 1993 (46 pages). cited by other. Letter to J.G. Risch from G. Patterson dated Feb. 12, 1993 (1 page); letter to J.A. McCann from G. Patterson dated Feb. 12, 1993 (1 page); and fax cover sheet to John Risch from R.G. Butler dated Jan. 8, 1993 (1 page). cited by other. Letter to J.G. Risch from G. Patterson dated Mar. 30, 1993 (1 page); memo to file EM-6085-2-905 dated Mar. 30, 1992 (1 page); and Project: Flatyard Beltpack System (FYBS) Project #6905 File: EM-2-905--Draft Radio Subsystem Specification dated Mar.30, 1993 (46 pages). cited by other. "Radio controlled units help steel company", Railway System Controls, Dec. 1970, pp. 19-21. cited by other. "Remote control replaces engineers in rail yards", Edmonton Journal, Jul. 8, 1992, p. D12. cited by other. "Thoroughbred Quality: Off and Running", Railway Age, Aug. 1992, pp. 19 and 46. cited by other. "How Conrail kept the mail moving (during nationwide strike)", Railway Age, Aug. 1, 1992, pp. 1-9. cited by other. "Reliability evaluation of a brake pipe flow indicator for use with remote control locomotive equipment", Association of American Railroads Research and Test Department, Mar. 1971, pp. 63344.1-63344.11. cited by other. Grolms, Reinhard and Schmidt, Manfred, "Die Funkfernsteuerung der Abdrucklokomotiven im Rbf Munchen Nord", 1990, pp. 231-235 (including translation--"System of radio control of shunting locomotives (switch engines) in the marshalling yard of MunchenNord"). cited by other. McElhenny, S.W. and Ryan, P.T., "Trends in rail transportion", Institute of Electrical and Electronics Engineers, 1968, p. 39. cited by other. Vandervort, Thomas L., "PCM used for remote controls", Railway System Controls, Aug. 1971, pp. 20-25. cited by other. Pankrat'ev, O.N. "Operating Experince with the Electrical Dave for a Coke-Car Locomotive in a Remote Control System", Koksi Khimiya, 1975, No. 8., pp. 33-37. cited by other. "A description of operation for vapor pacesetter* II dual mode Nos. 17466866-10, -11, -12", Technical Manual No. TM3-SC-2 & 17431524, -01 Amplifier Interface, Vapor Transportation Systems, Feb. 27, 1979, 48 pages. cited by other. Pacesetter II, "Instruction Manual", Vapor Corporation Sales Meeting 1973, 22 pages. cited by other. Society of Automotive Engineers, Inc., "Earthmovers can operate vua radio remote control", Automotive Engineering vol. 88, No. 4, 1980, pp. 43-44. cited by other. Ensink, T., "Radio controlled diesel shunters", 1977 Railway Engineer, vol. 2, No. 1, pp. 30-33. cited by other. "Radio remote control locomotives", National Safety Council, 1985, pp. 1-4. cited by other. Nagase, Kazuhiko, "Automation of Locomotive Shunting Operations at Musashino Marshalling Yard", Japanese Railway Engineering vol. 17, No. 1, 1977, pp. 19-21. cited by other. Krauss Maffei Verkehrstechnik, "K-Micro Anti-wheelslip and anti-wheelskid device", Product Line Vehicle Electronics, Aug. 27, 1991, pp. 1-21. cited by other. "Radio-Remote-Control Locomotives", National Safety Council, 1991, pp. 1-4. cited by other. Schonenberger, Albert "Speed Control for Shunters", Manager Vehicle Electronics, 3 pages, (no date). cited by other. Locomotive Control System LCS-Beltpack, CN Rail, Locomotive Control System LCS-Belpack LCS BP Presentation, Mar. 1992, pp. 1-15. cited by other. Locomotive Control System LCS-Beltpack Flat Yard Application CN Rail, LCS BP Presentation, Aug. 1992, pp. 1-11. cited by other. CN Rail's Beltpack Single Man Hump Operation, CN Rail LCS Presentation, Sep. 1992, pp. 1-15. cited by other. Borchert, Jurgen, (KM-Direct), "A new direction in control, monitoring and diagnosis of traction vehicles", pp. 1-7, (no date). cited by other. Gillen, Paul and Schonenberger, Albert, "Krauss-Maffei Maximum Power Control System", 2 pages, (no date). cited by other. "Trains moved by remote control", Montreal Gazette, Jul. 8, 1992, p. D1. cited by other. "CN derails engineers", Kitchener-Waterloo Record, Jul. 8, 1992, p. B7. cited by other. "CN set to replace trains' engineers with remote control", Vancouver Sun, Jul. 8, 1992, p. D2. cited by other. "Switching CN cars soon off-board job", Vancouver Province, Jul. 9, 1992, p. B14. cited by other. US Rail News Business Publishers, Inc., "CN Yard Workers Use Remote Controls", vol. 15, No. 15, Jul. 22, 1992, (page number unavailable online). cited by other. U.S. Appl. No. 10/374,590 (5,511,749), filed Feb. 26, 2003, entitled Remote Control System for a Locomotive, by Folkert Horst et al. cited by other. |
|
| Abstract: |
A locomotive control system comprising a remote transmitter issuing RF binary coded commands and a slave controller mounted on the locomotive that decodes the transmission and operates is dependence thereof various actuators to carry into effect the commands of the ground based operator. |
| Claim: |
What is claimed:
1. A remote control system for a locomotive, comprising: a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to executea certain function; a second transmitter generating a set of RF signal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and a slave controller receiving RF commands fromsaid first transmitter and from said second transmitter and assigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controllerbeing responsive: i) to at least one RF signal command generated by said first transmitter causing the locomotive to execute a predetermined function, ii) to at least one RF signal command generated by said second transmitter causing the locomotive toexecute a predetermined function, iii) to an RF signal command other than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function, iv) an RF signalcommand other than said at least one frequency signal command solely generated by a transmitter having a command authority holder operational status, and v) to a command authority relinquish RF signal command generated by one of said first and secondtransmitters having a command authority holder operational status to assign the command authority holder operational status to the other of said first and second transmitters; wherein said slave controller rejects an RF command, other than said at leastone RF signal command, issued from a non-selected one of said first and second transmitters.
2. A remote control system for a locomotive as claimed in claim 1 14, wherein said at least one RF signal command signals said slave controller to effect application of braking power.
3. A remote control system for a locomotive, comprising: a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function; a second transmitter generating a set of RFsignal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and a slave controller receiving RF commands from said first transmitter and from said second transmitter andassigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive: i) to at least one RF signal command generatedby said first transmitter causing the locomotive to execute a predetermined function, ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function, iii) to an RF signal commandother than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function, iv) to an RF signal command other than said at least one frequency RF signal commandsolely generated by a transmitter having a command authority holder operational status, v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status,and vi) to a command authority acceptance RF signal command generated by the other of said first and second transmitters having a command authority non-holder operational status, to assign the command authority holder operational status to the other ofsaid first and second transmitters; wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said first and second transmitters.
4. A remote control system for a locomotive as claimed in claim 3, wherein said at least one RF signal command signals said slave controller to effect application of braking power.
5. A remote control system for a locomotive as claimed in claim 3 wherein said at least one RF signal command is a signaling command.
6. A remote control system for a locomotive as claimed in claim 5 wherein said at least one RF signal command signals said slave controller to sound a bell or horn.
7. A remote control system for a locomotive as claimed in claim 3 wherein said slave controller initiates a safety check prior to assigning the command authority holder operational status to the other of said first and second transmitters.
8. A remote control system for a locomotive as claimed in claim 7 wherein said safety check includes determining if the locomotive is stopped.
9. A remote control system for a locomotive as claimed in claim 7 wherein said safety check includes a brake safety check.
10. A remote control system for a locomotive as claimed in claim 3 wherein said slave controller maintains a list of two or more identifiers of transmitters permitted to assume the command authority holder operational status.
11. A remote control system for a locomotive as claimed in claim 3 wherein the other of said first and second transmitters acknowledges acceptance within a predetermined time period in order for the slave controller to transfer the commandauthority holder operational status to the other of said first and second transmitters.
12. A remote control system as defined in claim 3, wherein said first and second transmitters generate RF signal commands on a common carrier frequency.
13. A remote control system for a locomotive, comprising: a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function; a second transmitter generating a set of RFsignal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and a slave controller receiving RF commands from said first transmitter and from said second transmitter andassigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive: i) to at least one RF signal command generatedby said first transmitter causing the locomotive to execute a predetermined function, ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function, iii) to an RF signal commandother than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function, iv) to an RF signal command other than said at least one RF signal command solelygenerated by a transmitter having a command authority holder operational status, and v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status toassign the command authority holder operational status to the other of said first and second transmitters; wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said firstand second transmitters; and wherein said slave controller maintains a list of two or more identifiers of transmitters permitted to assume the command authority holder operational status and said slave controller checks said list for an identifierdesignating the other of said first and second transmitters prior to assigning the command authority holder operation status to the other of said first and second transmitters.
14. A remote control system for a locomotive, comprising: a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function; a second transmitter generating a set of RFsignal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and a slave controller receiving RF commands from said first transmitter and from said second transmitter andassigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive: i) to at least one RF signal command generatedby said first transmitter causing the locomotive to execute a predetermined function, ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function, iii) to an RF signal commandother than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function, iv) to an RF signal command other than said at least one RF signal command solelygenerated by a transmitter having a command authority holder operational status, and v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status toassign the command authority holder operational status to the other of said first and second transmitters; wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said firstand second transmitters; and wherein the other of said first and second transmitters acknowledges acceptance of the command authority holder operational status prior to the slave controller assigning the command authority holder operation status to theother of said first and second transmitters.
15. A remote control system for a locomotive as claimed in claim 14 wherein said at least one RF signal command is a signaling command.
16. A remote control system for a locomotive as claimed in claim 15 wherein said at least one RF signal command signals said slave controller to sound a bell or horn.
17. A remote control system for a locomotive as claimed in claim 14 wherein said slave controller initiates a safety check prior to assigning the command authority holder operational status to the other of said first and second transmitters.
18. A remote control system for a locomotive as claimed in claim 17 wherein said safety check includes determining if the locomotive is stopped.
19. A remote control system for a locomotive as claimed in claim 17 wherein said safety check includes a brake safety check.
20. A remote control system for a locomotive as claimed in claim 14 wherein the other of said first and second transmitters acknowledges acceptance within a predetermined time period in order for the slave controller to transfer the commandauthority holder operational status to the other of said first and second transmitters. |
| Description: |
FIELD OF THE INVENTION
The present invention relates to an electronic system for remotely controlling a locomotive. The system is particularly suitable for use in switching yard assignments.
BACKGROUND OF THE INVENTION
Economic constraints have led railway companies to develop portable units allowing a ground based operator to remotely control a locomotive is a switching yard. The unit is essentially a transmitter communicating with a slave controller on thelocomotive by way of a radio link. Typically, the operator carries this unit and can perform duties such as coupling and uncoupling cars while remaining in control of the locomotive movement at all times. This allows for placing the point of control atthe point of movement thereby potentially enhancing safety, accuracy and efficiency.
Remote locomotive controllers currently used in the industry are relatively simple devices that enable the operator to manually regulate the throttle and brake in order to accelerate, decelerate and/or maintain a desired speed. The operator isrequired to judge the speed of the locomotive and modulate the throttle and/or brake levers to control the movement of the locomotive. Therefore, the operator must possess a good understanding of the track dynamics, the braking characteristics of thetrain, etc. in order to remotely operate the locomotive in a safe manner.
OBJECT AND STATEMENT OF THE INVENTION
An object of the invention is to provide a remote locomotive control system allowing the operator to command a desired speed and responding by appropriately controlling the throttle or brake to achieve and maintain that speed.
Another object of the invention is to provide a remote locomotive control system allowing for control of the locomotive from one of two different transmitters.
Yet another object of the invention is to provide a remote locomotive control system having the ability to perform a number of safety verifications in order to automatically default the locomotive to a safe state should a malfunction be detected.
SUMMARY OF THE INVENTION
As embodied and broadly described herein the invention provides a locomotive remote control system. The system has a transmitter capable of generating a binary coded radio frequency signal representing commands to be executed by the locomotiveand a slave controller for mounting on-board the locomotive. The slave controller has a) a receiver for sensing the radio frequency signal; b) a processor for receiving the radio frequency signal; and c) a velocity sensor for generating datarepresenting velocity of the locomotive. The processor responds to the velocity sensor and to the RF signal to actuate either one of a brake of a locomotive or a tractive power of the locomotive in order to attempt maintaining a requested speed.
As embodied and broadly described herein the invention also provides a locomotive control system which has a) a transmitter for generating a binary coded RF signal; and b) a slave controller mounted on-board the locomotive for receiving thatsignal, the slave controller selectively accepting commands from a first transmitter or from a second transmitter.
As embodied and broadly described herein the invention further provides a remote control system for a locomotive which has a) a transmitter for generating an RF binary coded signal; and b) a slave controller mounted on-board the locomotive. Theslave controller includes a first sensor responsive to pressure of compressed air in a main tank of the locomotive; and a second sensor responsive to flow of compressed air in a pneumatic brake line. The slave controller responds to output of thesensors to enable application of tractive power to the locomotive only when a pressure in the main tank is above a predetermined level and a flow of air in the brake line is below a predetermined level.
DESCRIPTION OF THE DRAWINGS
FIG. 1 is a top plan view of the portable transmitter of the remote locomotive control system in accordance with the invention;
FIGS. 2 and 4 are side elevational views of the portable transmitter;
FIG. 3 is a front elevational view of the portable transmitter;
FIG. 5 is a functional block diagram of the portable transmitter;
FIG. 6 is a diagram of the signal transmission protocol between the portable transmitter and a slave controller mounted on-board the locomotive;
FIG. 7 is a functional block diagram of the slave controller mounted on-board the locomotive;
FIG. 8 is a diagram illustrating the temporal relationship between the signal transmission and the operation of the receiver of the slave controller;
FIG. 9 is a diagram illustrating the temporal relationship between signal transmission from two portable transmitters and the operation of the receiver of the slave controller;
FIG. 10 is a detailed functional block diagram of the slave controller mounted on-board the locomotive;
FIG. 11 is a side elevational view of a velocity sensor for generating a pulse signal whose frequency is correlated to the speed of the locomotive;
FIG. 12 is a side elevational view of the velocity sensor shown in FIG. 11;
FIG. 13 illustrates the pulse output of the velocity sensor shown in FIGS. 11 and 12;
FIGS. 14a to 14d are a flow charts of the logic implemented to control the speed of the locomotive;
FIGS. 15a and 15b are diagrams illustrating the variation with respect to time of the velocity of the locomotive and of variables used to calculate a throttle or brake correction signal;
FIG. 16a is a flow chart illustrating the logic for controlling the speed of the locomotive in a COAST speed setting;
FIG. 16b is a flow chart illustrating the logic for controlling the speed in COAST WITH BRAKE setting;
FIGS. 17a and 17b are flow charts of the logic for transferring the command authority from one remote control transmitter to another; and
FIG. 18 is a flow chart of the safety diagnostic routine performed on the braking system of the locomotive.
DESCRIPTION OF PREFERRED EMBODIMENTS
With reference to the annexed drawings, the locomotive control system in accordance with the invention includes a portable transmitter 10 which generates a digitally encoded radio frequency (RF) signal to convey commands to a slave controllermounted on-board the locomotive. The slave controller decodes the transmission and operates various actuators on the locomotive to carry into effect the commands remotely issued by the operator.
FIGS. 1 to 4 illustrate the physical layout of the portable transmitter 10. The unit comprises a housing 12 enclosing the electronic circuitry and a battery supplying electric power to operate the system. A plurality of manually operable leversand switches projecting outside the housing 12 are provided to dial-in locomotive speed, brake and horn settings, among others.
The various controls on the portable transmitter are defined in the following table:
TABLE-US-00001 REFER- ENCE TYPE OF NUMERAL FUNCTION ACTUATOR 14 Locomotive Speed Control Multi-Position Lever 16 Locomotive Override Brake Multi-Position Lever Control 18 Reset Push-Button 20 Direction (Forward/Reverse/ Multi-Position SwitchNeutral) 22 Ring Bell/Horn Toggle Switch 24 Train Brake Control Toggle Switch 26 Power on/Lights Dim/Bright Multi-Position Switch 28 Status Request Push-Button 30 Time Extend Push-Button 32 Relinquish Control to Companion Push-Button Portable Transmitter
A detailed description of the various functions summarized in the above table is provided later in this specification.
On the top surface of the housing 12 is provided a display panel 34 that visually echoes the control settings of the portable transmitter 10. The display panel 34 includes an array of individual light sources 36, such as light emitting diodes(LED), corresponding to the various operative conditions of the locomotive that can be selected by the operator. Hence, a simple visual observation of the active LED's 36 allows the operator to determine the current position of the controls.
FIG. 5 provides a functional diagram of the portable transmitter 10. The various manually operable switches and levers briefly described above are constituted by electric contacts whose state of conduction is altered when the control settingsare changed. For instance, the push-button 18, 28, 30 and 32, and the toggle switches 22 and 24 have electric contacts that can assume either a closed condition or as opened condition. The multi-position levers 14 and 16, and the multi-positionswitches 20 and 26, have a set of electric contact pairs, only a single pair being closed at each position of the lever or switch. By reading the conduction state of the individual electric contact pairs, the commands issued by the operator can bedetermined.
An encoder 38 scans at short intervals the state of conduction of each pair of contacts. The scan results allow the encoder to assembly a binary locomotive status word that represents the requested operative state of the locomotive beingcontrolled. The following table provides the number of bits in the locomotive status word required for each function:
TABLE-US-00002 NUMBER OF BITS IN LOCOMOTIVE STATUS WORD FUNCTION 3 Locomotive Speed Control 3 Locomotive Brake Control 1 Reset 2 Direction (Forward/Reverse/ Neutral) 2 Ring Bell/Horn 3 Train Brake Control 1 Lights Dim/Bright 1 Status Request 1Time Extend 1 Relinquish Control to Companion Portable Transmitter
The locomotive status word also contains an identifier segment that uniquely represents the transmitter designated to control the locomotive. The purpose of this feature is to ensure that the locomotive will only accent the commands issued bythe transmitter generating the proper identifier.
Most preferably, the encoder 38 includes a microprocessor programmed to intelligently assemble the locomotive status word. The microprocessor continuously scans the electric contacts of the transmitter controls and records their state ofconduction. On the basis of the identity of the closed contacts, the program will produce the function component of the locomotive status word which is the string of bits that uniquely represents the functions to be performed by the locomotive. Theprogram then appends to the function component the locomotive identifier component and preferably a data security code enabling the receiver on-board the locomotive to check for transmission errors.
In a different form of construction, the encoder may be constituted by an array of hardwired logic gates that generate the locomotive status word upon actuation of the controls.
A transmitter 40 receives the locomotive status word and generates an RF signal for transmission of the coded sequence by frequency shift keying. In essence, the frequency of a carrier is shifted to a first value to signal a logical 1 and to asecond value to signal a logical 0. The transmission protocol is best shown in FIG. 6. Each transmission begins with a burst of the carrier frequency 42 for a duration of eight (8) bits (the actual time frame is established on the basis of thetransmission baud rate allowed by the equipment). Each bit of the data stream is then sent by shifting the frequency to the first or the second value depending on the value of the bit, during a predetermined time slot 44.
The transmitter 40 sends out the locomotive status word in repetition at a fixed rate selected in the range from two (2) to five (5) times per second. By providing the transmitter with a unique repetition rate, the likelihood of transmissionerrors is reduced when several portable transmitters in close proximity broadcast control signals to individual locomotives, as described below.
FIG. 7 provides a diagrammatic representation of the slave controller mounted on board the locomotive. The slave controller identified comprehensively by the reference numeral 46 has three main components, namely a receiver unit 48, a processingunit 50 and a driver unit 52. More particularly, the receiver unit 48 senses the locomotive status word sent out from the portable transmitter 10, decodes the transmission and supplies the resulting binary sequence to the processing unit 50. To achievea reliable communication link, the receiver 48 is synchronized with the transmitter 40 at three different levels. First, the receiver circuitry defines a signal acceptance window than opens itself at the rate at which the locomotive status word is sentout by the respective controlling transmitter 40. Second, the receiver 48 will observe the frequency value of the transmission in order to decode the binary sequence at intervals precisely corresponding to the time slots 44. Third, the acceptancewindow opens in phase with the signal transmission.
The first two levels of synchronization are established through hardware design, by setting the transmitter 40 and the receiver 48 to the same period of transmission/reception. On the other hand, the phasing of the receiver to the incominglocomotive status word transmission is effected through observation of the burst of carrier frequency 42 that begins each transmission cycle. The diagram in FIG. 8 graphically illustrates the relationship between the signal transmission and the signalreception. The time line 54 shows the successive transmission of the locomotive status word as a series of blocks 56. The activity of the receiver 48 is shown on the time line 58. The hatched areas correspond to the time intervals during which thereceiver is not listening. At time t=0 the first locomotive status word is sent out by the transmitter 40. The burst of the carrier frequency 42 sensed by the receiver 48 which then activates the sequence of opening and closing of the signal acceptancewindow which is fully synchronized (in period and phase) with the signal transmission.
This characteristic is particularly advantageous when several transmitters broadcast simultaneously control signals to different locomotives in close proximity to one another. By setting each transmitter (and the companion receiver) at a uniquetransmission/reception period, secure communication links can be maintained even when all the transmitters use the same carrier frequency. FIG. 9 illustrates this feature. Time line 60 shows the transmission pattern of a first portable transmitter. The time line 62 depicts the window of acceptance of the companion receiver. The numeral 64 identifies the transmission pattern of a second portable transmitter. Assuming that both portable transmitters are actuated exactly at t=0, the signal receivedduring the first opening of the window of acceptance will be corrupted since two locomotive status word transmissions are concurrent in time. However, the third and the seventh locomotive status word transmissions from the first portable transmitterwill be clearly received since there is no overlap with the locomotive status words sent out by the second portable transmitter. Hence the purpose of providing each transmitter with a unique signal repetition rate reduces the likelihood of transmissionconflicts.
It should be noted that the receiver 48 can, and probably will, correctly receive from time to time a locomotive status word from an unrelated transmitter. This status word will be rejected, however, because the transmitter identifier will notmatch the value stored in the memory of the slave controller.
The transmitter/receiver gear of the remote locomotive control system has been described above in terms of function of the principal parts of the system and their interaction. The components and interconnections of the electric network necessaryto carry into effect the desired functions are not being specified because such details are well within the read of a man skilled in the art.
FIG. 10 provides a functional diagram of the processing unit 50. A central processing unit (CPU) 66 communicates with a memory through a bus 70. A reserved portion memory 68 contains the program that directs the CPU 66 to control the locomotivedepending on the several inputs that will be discussed later. The memory also contains a section allowing temporary storage of data used by the CPU when handling hardware events.
The current locomotive status and the commands issued from the remote transmitter are directed to the CPU through an interface 72 communicating with the bus 70. The interface 72 receives input signals from the following sources: a) A speeddirection sensor 74 providing locomotive velocity and direction of movement data; b) A speed sensor 76 providing solely locomotive velocity data. The speed sensor 76 provides the CPU 66 with redundant velocity data allowing the CPU 66 to detect apossible failure of the main speed sensor 74. c) A pressure sensor 78 observing the air pressure in the locomotive brake system; d) A pressure sensor 79 observing the air pressure in the main reservoir; e) A pressure sensor 80 observing the air pressurein the train brake system; f) A sensor 82 observing the flow rate of air in the brake system of the train; and g) The decoded locomotive status word generated by the receiver 48.
The structure of the speed/direction sensor 74 is illustrated in FIGS. 11 and 12. The sensor includes a disk 84 mounted to an axle 86 of the locomotive. When the locomotive is moving the disk 84 turns at the same angular speed as the axle 86. The disk 84 is provided with a layer of reflective coating 85 deposited to form on the periphery of the disk equidistant and alternating reflective zones 87 and substantially non-reflective zones 89. A pair of opto-electric sensors 92 and 94 are mountedin a spaced apart relationship adjacent the periphery of the disk 84. The sensor 92 comprises an emitter 92a generating a light beam perpendicular to the plane of the disk 84, and a receiver 92b producing an electric signal when sensing the reflectionof the light beam on the reflective zones 87. However, when a substantially non-reflective surface 89 registers with the sensor 92, the output of the receiver is null or very low. The structure and operation of the opto-electric sensor 94 is identicalto the sensor 92. Thus, the sensor 94 comprises an emitter 94a and a receiver 94b.
The spacing between the opto-electric sensors 92 and 94 is such that they generate output pulses due to the periodic change in reflectivity of the disk surface, occurring at different instants in time. As best shown in FIG. 10, and assuming thatthe disk 84 rotates in the counter clockwise direction, when the sensor 92 switches "on" as a result of a reflective zone 87 registering with the emitter 92a and the receiver 92b, the sensor 94 is still in a stable on condition and can be caused toswitch off only by further rotating the disk 84.
Preferably, the disk 84 and the sensors 92 and 94 are mounted in a hermetically sealed housing to protect the assembly against contamination by water or dirt.
FIG. 13 illustrates the signal waveforms produced by the opto-electric sensors 92 and 94. Both outputs are pulse trains having the same frequency but out of phase by an angle a which depends upon the spacing of the sensors 92 and 94. When thelocomotive moves forward the disk 84 rotates in a given direction, say clockwise. In this case, the pulse train from sensor 94 leads the public train from sensor 92 by angle a. When the locomotive is in reverse, then the output of sensor 92 leads theoutput of sensor 94 by angle a (this possibility is not shown in FIG. 13). The processing unit 50 observes the occurrence of the leading pulse edges from the sensors 92 and 94 with relation to time to determine the identity of the leading signal, whichallows deriviation of the direction of movement of the locomotive.
Velocity data is derived by measuring the rate of fluctuation of the signal form any one of sensors 92 and 92. It has been found practical to determine the velocity at low locomotive speeds by measuring the period of the signal. However, athigher speeds the frequency of the signal is being measured since the period shortens which may introduce non-negligible measurement errors.
The speed sensor 76 is similar to sensor 74 described above with two exceptions. First, a single opto-electric sensor may be used since all that is required is velocity data. Second, the speed sensor 76 is mounted to a different axle of thelocomotive.
The pressure sensors 78 and 79 are switches mounted to the main reservoir and to the pneumatic line that supplies working fluid to the locomotive independent braking mechanism, and produce an electric signal in response to pressure. Thesesensors merely indicate the presence of pressure, not its magnitude. In essence, each sensor produces an output when the air pressure exceeds a preset level, indicating whether the reserve of compressed air is sufficient for reliable braking. Unlikethe sensors 78 and 79, the pressure sensor 80 is a transducer that generates a signal indicative of presence and magnitude of pressure in the train brake air line.
The airflow sensor 82 observes the volume of air circulating in the pneumatic lines of the train brake system. The results of this measurement along with the output of pressure sensor 78 provide an indication of the state of charge of thepneumatic network. It is considered normal for a long pneumatic path to experience some air leaks due primarily to imperfect unions in pipe couplings between cars of the train. However, when a considerable volume of air leaks, the airflow sensor 82enables the processing unit to sense such condition and to implement corrective measures, as will be discussed later.
The interface 72 receives the signals produced by the sensors 74, 76, 78, 79, 80, and 82 and digitizes them where required so they can be directly processed by the CPU 66. The locomotive status word issued by the receiver 48 requires noconversion since it is already in the proper binary format.
The binary signals generated by the CPU 66 that control the various functions of the locomotive are supplied through the bus 70 and the interface 72. The following control signals are being issued: a) A signal 98 to set the lights of thelocomotive to off/low intensity/high intensity. The signal is constituted by one (1) bit, each operative condition of the locomotive lights being represented by a different bit state; b) A two (2) bit signal 100 to operate the bell or the horn of thelocomotive; c) A five (5) bit signal 102 for traction control. Four bits are used to communicate the throttle settings (only eight (8) settings are possible) and one bit for the power contacts of the electric traction motors; d) An eight (8) bit signal104 for train brake control. The number of bits used allows 256 possible brake settings; and e) A seven (7) bit signal 106 for independent brake control. The number of bits used allows 128 possible brake settings.
The interface 72 will convert at least some of the signals 98, 100, 102, 104, and 106 from the binary form to a different form that the device at which the signals are directed can handle. This is described in more detail below.
The actuators for the lights and bell/horn are merely switches such as relays or solid state devices that energize or de-energize the desired circuit. The interface 72, in response to the CPU 66 instruction to set the lights/bell/horn in thedesired operative position, will generate an electric signal that is amplified by the driver unit 52 and then directed to the respective relay or solid state switch.
With regard to the traction control it should be noted that most locomotive manufacturers will install on the diesel/electric engine as original equipment a series of actuators that control the fuel injection, power contacts and brakes amongothers, hence the traction power that the locomotive develops. This feature permits coupling several locomotives under control of one driver. By electrically and pneumatically interconnecting the actuators of all the locomotives, the throttle commandsthe driver issues in the cab of the mother engine are duplicated in all the slave locomotives. The locomotive remote control system in accordance with the invention makes use of the existing throttle/brake actuators in order to control power. Theinterface 72 converts the binary throttle settings issued by the CPU 66 to the standard signal protocol established by the industry for controlling throttle/brake actuators. This feature is particularly advantageous because the locomotive remote controlsystem does not require the installation of any throttle/brake actuators. As in the case of the lights and bell/horn signals 98 and 100, respectively, the traction control signal 102 incoming from the interface 72 is amplified in the driver unit 52before being directed to the throttle/brake actuators.
The train brake control signal 104 issued by the interface 72 is an eight (8) bit binary sequence applied to a value mounted in the train brake circuit to modulate the air pressure in the train line that controls the braking mechanism. Theworking fluid is supplied from a main reservoir whose integrity is monitored by the pressure sensor 79 described above. The independent locomotive brake is controlled in the same fashion with binary signal 106.
The operation of the locomotive control system will now be described with more detail.
SPEED CONTROL TASK
The flowchart of the speed control logic is shown in FIGS. 14a to 14d. The program execution begins by reading the velocity data generated from sensors 74 and 76 that are mounted at different axles of the locomotive. The data gathered from eachsensor is stored in the memory 68 and then compared at step 124. If both sensors are functioning properly they should generate identical or nearly identical velocity values. In the event a significant difference is noted the CPU 66 concludes that amalfunction exists and issues a command (step 126) to fully apply the independent brake in order to bring the locomotive to a complete stop.
Assuming that no mismatch between the readings of sensors 74 and 76 is detected, the CPU 66 will compare the observed locomotive speed with the speed requested by the operator. The later variable is represented by a string of three (3) bits inthe locomotive status word (the flowchart of FIGS. 14a to 14d assumes that the locomotive status word has been correctly received, has the proper identifier and has been stored in the memory 68). The operator can select on the portable transmitter 10eight possible speed settings, each setting being represented by a different binary sequence. The speed settings are as follows:
1) STOP
2) COAST WITH BRAKE
3) COAST
4) COUPLE (1 MILE PER HOUR (MPH))
5) 4 MPH
6) 7 MPH
7) 10 MPH
8) 15 MPH
If any one of settings 4 to 8 have been selected, which require the locomotive to positively maintain a certain speed, the CPU 66 will effect a certain number of comparisons at steps 128 and 130 to determine if there is a variation between theactual speed and the selected speed along with the sign of the variation, i.e. whether the locomotive is overspeeding or moving too slowly. More particularly, if at step 128 the CPU 66 determines that the observed speed is in line with the desired speedno corrective measure is taken and the program execution initiates a new cycle. On the other hand, if the actual speed differs from the setting, the conditional test 130 is applied to determine the sign of the difference. Under a negative sign, i.e.the locomotive is moving too slowly, the program execution branches to processing thread A (shown in FIG. 14b). In this program segment the CPU 66 will determine at step 132 the velocity error by subtracting the actual velocity from the set pointcontained in the locomotive status word. A proportional plus derivative plus integral algorithm is then applied for calculating throttle setting intended for reducing the velocity error to zero. Essentially the CPU 66 will calculate the sum of theintegral of the velocity error signal (calculated in step 145), of the derivative of the velocity error signal (calculated in step 147), and of a proportional factor (calculated in step 143). The latter is the velocity error signal multiplied by apredetermined constant. The result of this calculation provides a control signal that is used for modulating the throttle actuator of the locomotive through output signal 102 of the interface 72.
FIG. 15a is a diagram illustrating the variation of the current velocity signal, the set point, the velocity error, the velocity error integral, the velocity error derivative and velocity error proportional with respect to time.
With reference to FIG. 14d, when the new throttle setting has been implemented the program execution continues to steps 134 and 136 where the current direction of movement and speed of the locomotive are determined from the reading of sensor 74. In the event the CPU 66 observes a zero speed value for a time period of more than 20 seconds in spite of the fact that a tractive effort is being applied (step 138), it declares a malfunction and fully applies the independent locomotive brake. Normally, when a tractive effort is applied it causes the locomotive to accelerate. The movement, however, may occur after a certain delay following the application of the tractive effort especially if the locomotive is pulling a heavy consist. Still,if after a certain time period no movement is observed, some sort of malfunction is probably present. One possibility is that both sensors 74 and 76 have failed and register zero speed even when the locomotive is rolling. This is highly unlikely butnot impossible. When such condition is encountered the CPU 66 immobilizes the locomotive immediately upon determination that a fault is present.
The 20 seconds waiting period before application of the independent brake is implemented by verifying the velocity data from sensor 74 during a certain number of program execution cycles. For instance, the current velocity value is compared tothe velocity value observed during the previous execution cycle that has been stored in the memory 68. If a change is noted, i.e. the locomotive moves, then the step 138 is considered to have been successively passed. If, however, after 200 executioncycles that require about 20 seconds to be completed, no change with the previously observed velocity value is noted, the independent brake is fully applied.
Assuming that motion of the locomotive is detected at step 138, the program proceeds to step 140 where the direction of movement of the locomotive read from the output of sensor 74 is compared to the direction of movement specified by theoperator. This value is represented by a four (4) bit string is the locomotive status word. If the locomotive is moving rearwardly while the operator has specified a forward movement, the CPU 66 detects a condition known as "rollback". Such conditionmay occur when the locomotive is starting to move upwardly on a grade while pulling a heavy consist. Under the effect of gravity the train may move backward for a certain distance until the traction system of the locomotive has been able to build-up thepulling force necessary to reverse the movement. During a rollback condition the electric current in the traction motors of the locomotive increase beyond safe levels. Hence it is desirable to limit the rollback in order to avoid damaging the hardware. The program is designed to tolerate a rollback condition for no longer than 20 seconds. If the condition persists beyond this time period the independent brake is fully applied. The 20 seconds delay is implemented by comparing the evolution of theresults of the comparison step 140 with the results obtained during the previous execution cycle; if the results do not change for 200 program execution cycles that require about 20 seconds of running time on the CPU 66, a fault is declared and the brakeapplied.
In the case where both tests 136 and 140 are successively passed, i.e. the locomotive is moving in the selected direction, the program execution returns to the beginning of the cycle as shown in FIG. 14a.
Referring back to step 130, if the conditional branch points toward processing thread B (see FIGS. 14a and 14c), which means that the locomotive is overspeeding, then the CPU 66 will calculate at step 142 the difference between the selected speedand the observed speed. The resulting error signal is then processed by using the proportional plus derivative plus integral algorithm described above to derive a new throttle setting. If by controlling the throttle (reducing the tractive effortdeveloped by the engine) speed correction cannot be achieved, the brake is applied. The brake is modulated by using a proportional plus derivative plus integral algorithm. FIG. 15b illustrates the brake response, along with the actual brake, error,proportional, derivative, and integral signals with relation to time. The calculated brake setting is issued as binary signal 106 (see FIG. 10) that is directed to the braking mechanism on the locomotive.
The STOP, COAST WITH BRAKE and COAST settings will now be briefly described. The STOP setting, as the name implies, intends to bring and maintain the locomotive stationary. When the CPU 66 receives a locomotive status word containing a speedsetting corresponding to STOP it immediately terminates the tractive effort and applies the independent locomotive brake at a controlled rate. The program logic to implement the COAST and COAST WITH BRAKE services is illustrated as flowcharts in FIGS.16a and 16b, respectively. When the multi-position lever 14 is set to the COAST setting the program reads the velocity data from sensor 74 at step 144 and then compares it at step 146 to the velocity value recorded during the previous program executioncycle. If the consist accelerates under the effect of gravity down a grade (no tractive effort is applied by the system in the COAST and COAST WITH BRAKE settings) the observed velocity will show an increase. The CPU 66 will then apply the independentlocomotive brake to slow the consist at step 148. The brake is modulated by using a proportional plus integral plus derivative (PID) algorithm. In the event that no velocity increase is observed the CPU 66 may set (depending upon the control signalresulting from the PID calculation) the independent brake to the release position at step 150 or keep the brake at the current setting.
The next step in the program execution is a test 152 which determines if the speed of the consist is below 0.5 MPH. In the affirmative the movement is stopped by full application of the independent brake at step 154. If the speed of the consistexceeds or is equal to 0.5 MPH then the program returns to step 144.
The COAST WITH BRAKE function, depicted in FIG. 16b is very similar to the COAST service described above. The only difference is that a minimum independent brake pressure of 15 pounds per square inch (psi) is always maintained. At step 156 theacceleration of the consist is determined by comparison of the current velocity with a previous velocity value. If a positive acceleration is observed, such as when the consist moves down a grade, the brake pressure is increased at step 158 (the controlis made by a PID algorithm). During the next program execution cycle the acceleration is determined again. If no positive acceleration is sensed the brake pressure is returned to 15 psi at step 160. At step 162 the velocity of the consist is testedagainst the 0.5 MPH value. If the current speed is less than this limit a full independent brake application is effected in order to stop the consist, otherwise the program execution initiates a new cycle.
EXCHANGE OF COMMAND AUTHORITY BETWEEN REMOTE TRANSMITTERS
In some instances a single operator may effectively and safely control a consist that includes a limited number of cars remaining at all times well within the visual range of the operator. However, when the consist is long two operators may berequired, each person being physically close to and monitoring one end of the train. The present invention provides a locomotive control system capable of receiving inputs from the selected one of two or more remote transmitters. In a two-operatorarrangement, each person is provided with a portable transmitter 10 able to generate the complete range of locomotive control commands. In order to avoid confusion, however, the slave controller on-board the locomotive will accept at any point in timecommands from a single designated transmitter. The only exception is a limited set of emergency and signalling commands that are available to both operators. The control function can be transferred from one transmitter to the other by following thelogic depicted in the flowchart of FIGS. 17a and 17b.
Upon reception of a locomotive status word, the CPU will compare the identifier in the word to a list of two or more possible identifiers stored in the memory 68. The list of acceptable identifiers contains the identifiers of all the remotetransmitters permitted to assume control of the locomotive. If the identifier in the locomotive status word does not correspond to any one of the identifiers in the list, then the system rejects the word and takes no action. Otherwise, the system willdetermine what are the requested functions that the locomotive should perform. If the locomotive status word requests application of the emergency brake or sounding the bell or horn, then the system complies with the request. Otherwise (step 179), if anew speed setting is requested for example, the system will comply only if the identifier in the locomotive status word matches a specific identifier in the list that designates the remote transmitter currently holding the command authority. If thisstep is verified, then the locomotive executes the command unless the command is a request to transfer command authority to another remote controller. The CPU 66 recognizes this request by checking the state of the bit reserved for this function in thelocomotive status word. If the state of the bit is 1 (command transfer requested) the program execution continues at step 180 where the CPU 66 will perform a certain number of safety checks to determine if the command transfer can be made in a safemanner. More particularly, the CPU will determine if the locomotive is stopped and if the brake safety checks (to be described later) are verified. If the locomotive is moving or the brake safety checks fail, then no action is taken and the commandremains with the portable transmitter currently in control. If this test is passed, then the CPU will monitor the reset bit of all the locomotive status words received that carry an identifier in the list stored in the memory 68 (the reset bit issued bythe transmitter currently holding the controls is not considered). If within 10 seconds of the reception of the request to transfer control from the current transmitter the CPU observes a reset bit in the high position, which means that the operator ofa remote transmitter in the pool of candidates able to acquire control has depressed the reset button, then the CPU 66 shifts in memory the identifier associated with the reset bit at high to the position of the current control holder. From now on theCPU 66 will accept commands (except the safety related functions of emergency brake and sounding the bell/born) only from the new authority. The procedure of checking the reset bit is used for safety purposes in order to transfer the control of thelocomotive only when the target remote controller has effectively acknowledged acceptance of the control.
If within the 10 seconds no reset bit is set to the high position, the CPU 66 will abort the transfer function and resume normal execution of the program.
BRAKE SAFETY CHECKS
FIG. 18 is a flow chart of a program segment used to identify the state of readiness of the braking system before authorizing movement of the locomotive. When a command is received to move the locomotive forward, the CPU 66 will check thepressure in the main tank that supplies compressed air to both the independent locomotive and to the train brake. If the pressure is below a preset level, the command to move the locomotive forward is aborted and no action is taken. Asecond/verification step is required to allow movement of a locomotive which is a measurement of the flow rate of compressed air in the train brake line. The traction control signal 102 is issued only when the compressed air flow rate is below apredetermined level. As briefly discussed earlier, it is normal for a train brake line to exhibit a certain leakage due to imperfect couplings in unions between cars. However, when this leakage exceeds a predetermined level, either there is a majorleak or the system is discharged and it is currently being pumped with air. In both cases the train should not be operated for obvious safety reasons.
The scope of the present invention is not limited by the description, examples and suggestive uses herein as modification and refinements can be made without departing from the spirit of the invention. Thus, it is intended that the presentinvention covers the modification and variations of this invention provided they come within the scope of the appended claims and their equivalents.
* * * * * |
|
|
|