A scaffold assembling of a large component for a boiler requiring inspection is not performed by a high-place work but assembled safely and in a short time. The scaffold is assembled to the large component for the boiler supported by a component supporting beam at the ground side before
An interference with existing structures is prevented at a time of a lifting construction of a boiler module. When the boiler module is lifted from the ground by lifting jacks provided on a steel frame main-beam and made an install construction to the main-beam, lifting jacks enabled to